Built for the
Toughest Digs
Fully equipped, $5M insured and WSIB registered — this is the hydrovac and vacuum excavation work we handle across Southern Ontario, from a single utility pothole to a winter watermain emergency.
Tornado F3C Hydrovac, Sized for Real Jobs
The numbers estimators ask for before they book: tank, water, hose and boom reach. Per unit: a Tornado F3C tri-drive with heated water for winter work, and owner-led crews on every dig.
Also on the truck
- Heated waterCuts through frozen ground for winter daylighting, watermain breaks and frost digs.
- Low-clearance deflectorRemovable deflector plate for work under overhead restrictions or in tight corners.
- Tri-drive chassisThree driven axles for traction on shoulders, boulevards and winter sites, so the truck stays put while the hose does the work.
- Owner-led crewsThe owner quotes the job and stays accountable for it on site. A swamper rounds out the crew when the scope calls for it.
- Spoil hauled, not leftSlurry goes to a licensed receiving facility under our MECP EASR registration, shown as its own line on your quote.
What we need from you
- A valid Ontario One Call ticketWe confirm it before we mobilize, and we can arrange private locates for anything the public locate does not cover.
- Room to stage the truckA full-size tri-drive truck needs a spot near the dig; the remote hose covers the rest when it cannot park close.
- A water fill point for long digsHydrant permit or on-site supply; we carry 6,000 L and plan the fills around your schedule.
- A site contact and PO or approvalSomeone we can call on arrival, and whatever your accounts team needs on the invoice.
Every Non-Destructive Dig
From a single utility pothole to a winter watermain emergency, these are the jobs AMG is equipped and trained to take on across Southern Ontario.
Job-Site Photos
Real digs, real conditions across the GTA — buried utilities exposed damage-free, exactly as we hand them over.
The Same Standard, Every Single Dig
The same disciplined process runs on every project, big or small — from the pre-dig tailboard to the documentation we leave behind.
- Locate-verified before we cutOne Call tickets confirmed, private locates arranged, utilities daylighted.
- Full documentationPhotos, confirmed depths and a daily report handed to you on completion.
- $5M general liability, $1M limited pollution, $2M autoWSIB registered and MECP EASR-registered for slurry transport. A certificate of insurance naming you as additional insured is issued through our broker on request.
- A clean demobilizationSpoil removed, site left safe and tidy for your next crew.
Documented · riser exposed, undamaged
Capability Statement
Insurance, equipment, coverage and process — one PDF, ready to drop into your bid package or vendor file.
Let's Talk About Your Next Dig
Bring us the job the other crews keep putting off. Tell us the site, scope and timeline, and you'll hear back the same business day with a clear scope and price.